Friday, December 10, 2010

Bathroom Remodel Part 2

After the base for the shower being held up in snow on a truck for about a week Papa Bear was finally able to resume some work on the bathroom. In order for the base to "fit" and line up with the drain with minimal tweaking, he had to chisel out about 1/4 inch from each of the studs in the shower area, but just the bottom part. Here he is putting in some leveling compound.

He had to do a whole bunch of measurements I would have not thought of until it was too late. We get to start tiling soon :)

The bathroom is proving to be quite a challenge and Momma thinks he's done doing remodeling after this. I'm pretty sure I can convince him to re-do our blue bathroom since it is a standard size.