It's been a long process, but we haven't been working on it non-stop. We work when we can and there isn't a real hurry, other than before summer and cottage weekends start. We put in our new light fixture. Here is the old one dangling out of the wall. Luke decided he'd try to have it done before I got home from school one day. That didn't work out since he needed someone to hold up the new one while he put the wiring together. It's the thought that counts. As with any project, it took longer than anticipated. It was daylight when we started, and by the time we were done it was almost dark.Papa Bear came over and the decorative moulding trim was put up, the vanity installed as well as the toilet. All we have to do is seal the grout and put in the shower fixture and curtain rod. A few touch ups on the paint and I'll post the finished bathroom. I wasn't going to paint the linen closet, but decided that I will. It is my over spring break project along with touching up paint in the house. We've got scuffed up backers on the stairs and some nicks on the hall walls. Vanity installation. There was a leak under the sink but we just had to adjust the drain stopper. The toilet installation went well. Papa Bear applied some silicone to some of the internal parts so we had to wait 24 hours before filling the tank and testing it out. All worked fine when we got to test it out.
No comments:
Post a Comment